{"id":1833,"date":"2020-03-10T13:37:07","date_gmt":"2020-03-10T13:37:07","guid":{"rendered":"https:\/\/radcon.plavipixel.dev\/novost\/upotreba-radmyx-dodatka-za-vodonepropusnost-betona-u-kragujevcu-srbija\/"},"modified":"2026-05-27T12:03:27","modified_gmt":"2026-05-27T12:03:27","slug":"use-of-radmyx-additive-for-waterproofing-concrete-in-kragujevac-serbia","status":"publish","type":"novost","link":"https:\/\/radcon-croatia.hr\/en\/news\/use-of-radmyx-additive-for-waterproofing-concrete-in-kragujevac-serbia\/","title":{"rendered":"Waterproofing of the foundation slab and basement walls"},"content":{"rendered":"<p class=\"wp-block-paragraph\">In today&#039;s conditions of &quot;fast construction&quot; and labor shortages, there is an increasing demand for construction using the &quot;White Tub&quot; system, where the concrete itself takes on the function of waterproofing. For this purpose, Radmyx concrete waterproofing additive based on &quot;crystallization&quot; was used on the foundation slab and basement walls of a building in Kragujevac (Serbia), which, by growing crystals in the pores and capillaries of the concrete, creates an internal membrane against the passage of water through the concrete. In this system, high-quality insulation of construction joints in concrete is certainly important, for which purpose CEMflex VB sheets were used, which also work on the principle of crystallization in the joint and provide 100% protection of the construction joint against the passage of water.<\/p>","protected":false},"excerpt":{"rendered":"<p>U dana\u0161njim uvjetima \u201ebrze gradnje\u201c i nedostatka radne snage sve vi\u0161e zahtjeva je za gradnjom po sistemu \u201cBijela kada\u201c gdje beton sam preuzima funkciju hidroizolacije. Za tu namjenu na temeljnoj plo\u010di i podrumskim zidovima objekta u Kragujevcu (Srbija) kori\u0161ten je Radmyx dodatak za vodonepropusnost betona na bazi \u201ekristalizacije\u201c, koji rastom kristala u porama i kapilarama [&hellip;]<\/p>\n","protected":false},"featured_media":1065,"template":"","meta":{"_acf_changed":true,"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","iawp_total_views":1},"categories":[8,7,2],"class_list":["post-1833","novost","type-novost","status-publish","has-post-thumbnail","hentry","category-istaknuta-objava","category-radmyx","category-projekti"],"acf":[],"_links":{"self":[{"href":"https:\/\/radcon-croatia.hr\/en\/wp-json\/wp\/v2\/novost\/1833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/radcon-croatia.hr\/en\/wp-json\/wp\/v2\/novost"}],"about":[{"href":"https:\/\/radcon-croatia.hr\/en\/wp-json\/wp\/v2\/types\/novost"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/radcon-croatia.hr\/en\/wp-json\/wp\/v2\/media\/1065"}],"wp:attachment":[{"href":"https:\/\/radcon-croatia.hr\/en\/wp-json\/wp\/v2\/media?parent=1833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/radcon-croatia.hr\/en\/wp-json\/wp\/v2\/categories?post=1833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}